EVMS forProject - Earned Value Management System

by forProject Technology, Inc.
  • App Type

    On-premises Application
  • Business Need

    Business Application Development
  • Works With

    Microsoft Project Server 2010, Microsoft Project Server 2013, Microsoft SharePoint Server 2010, Microsoft SharePoint Server 2013 Enterprise, Windows Server... (more)
  • Industry Focus

    Architecture, Engineering & Construction, Government, Manufacturing

EVMS forProject represents the latest generation of Earned Value Management (EVM) and project cost management tools from forProject Technology. Built for the enterprise, EVMS forProject is designed to work closely with Microsoft Project Server and SharePoint.

EVMS forProject is an enterprise-class Earned Value Management (EVM) software application suite from forProject technology, and is architected for scalability, flexibility, security and performance.

A powerful, flexible, easy-to-use system for managing project costs, it provides functionality for planning, budgeting, measuring earned value, tracking actual costs, forecasting, variance analysis, change management and reporting.

EVMS forProject is designed to manage projects both large and small, and to scale up to handle hundreds of projects and users in even the largest enterprises. It was designed from the ground up to work closely with Microsoft Project Server (2007 and 2010) and SharePoint.

EVMS forProject was designed around the EVM principles and processes as outlined in the American National Standards Institute / Electronics Industry Alliance 748 – Guidelines for Earned Value Management Systems (ANSI 748).

Key Benefits:

- Improve project performance measurement and management visibility
- Promote consistency of practice across the enterprise
- Meet widely-adopted industry and government EVMS guidelines
- Increase user adoption of Earned Value Management

EVMS forProject - Earned Value Management System has not been reviewed by any customers.